Standing Seam Metal Roofing in Warner Robins, GA

Standing Seam Metal Roofing in Warner Robins GA
Standing Seam Metal Roofing in Warner Robins GA
Standing Seam Metal Roofing in Warner Robins GA
Standing Seam Metal Roofing in Warner Robins GA

Robins Air Force Base - Building 125

Project Overview

Robins ARB contracted New South Construction to overhual the Air Force’s largest C-5 aircraft facility (cluster of 4 hangars). New South contracted us to install new standing seam metal roofing panels, insulated metal panels, translucent panels, and some misc metal wall panels.

Location: Robins ARB, Warner Robins, GA
Completion Date: January 2019
Project Duration: 6 Years
Total Coverage Area: SSR – 250,000SF (Split Among 4 Bays), Insulated Metal Wall Panels – 72,000SF (Split Among 4 Bays)
General Contractor: New South Construction
Project Manager: Jesse Rose

Technical Specifications

  • Berridge 22ga Curved Zee Lock Panel, approx. 155’ Long panels each side of the bays
  • Kingspan KS Micro Rib - Insulated Metal Wall Panels at each end of the building bays

Project Challenges & Solutions

These facilities were very large, required a lot of man power, for an extended period of time. While one hangar was being worked on, the other 3 remained operational.

Any military contract comes with certain challenges regarding logistics, production, timing, and coordination. Our field crews and superintendent did an amazing job working through any and all challenges that came their way.

 

Installation Process

These new panels on the roof and wall provided a facelift to a much-needed set of buildings.