PCG completed a custom canopy for Atlas Ministries in Greensboro, Georgia, in July 2025. The project featured a 38’ by 19’ aluminum canopy with powder-coated columns and beams, plus a standing seam metal roof. The main challenge was the long-span design, which required a 15’ projection from the building and a 30’ span between columns. PCG engineered a welded-beam and front-truss system, transported it to the site, and installed it with precision. The project shows PCG’s strength in custom fabrication, structural coordination, and clean installation.

Location: Greensboro, GA
Completion Date: July 2025
Project Duration: 3 weeks
Total Coverage Area: 4-Story Office Tower
General Contractor: Brasfield & Gorrie
Architect: Vickers Design Group
PCG Project Manager: Collins Westcott

Technical Specifications

  • Custom Fabrication
    • Overall canopy footprint is 38’ wide x 19’ deep
    • 8”x8” aluminum columns
    • 6”x10” aluminum tube purlins and beams
    • Powdercoat finish in 40 Bronze color
  • Standing Seam Metal Roofing
    • Berridge Cee-Lock Panel with Charcoal finish

Frequently Asked Questions

Was there anything special about this job that highlights PCG’s custom fabrication capabilities?

This project provided a special challenge in that it required both a 15’ span off of the building and a 30’ wide span between columns. PCG designed a fully engineered system including a welded splice joint of the main front 6x10 aluminum tube beam to accommodate the span and overall width of 38’. This beam was the base of a fully welded front truss that was transported to the jobsite on a 40’ flatbed trailer and hoisted into place on top of the 8x8 columns.

One the front truss was set, the 6x10 purlins were mounted into pre-coordinated wall support and cleanly attached to the front truss. These purlins provided the final support for the standing seam metal roofing which provides the water-proof layer of the canopy system.